Kind of an interesting day, customer called us to move a machine that was TOO WIDE TO FIT BETWEEN MACHINERY WHERE IT WAS TO BE MOVED. This problem has only two solutions, one move the other machinery, and another move the machine above, as the ceiling was high. We chose the latter and saved the customer what could become a really bad day (trucker waiting to pick up the machine for the buyer) and a lot of extra money spent moving other machinery.