By Igor Chudov, owner, Chicago Machinery Movers, Berkeley, Illinois. Moving and removing industrial machinery since 1998.
A large company that makes I-beams and square tubing contracted my company to remove a Pangborn shot blast machine, along with a large amount of conveyors and auxiliary machinery.
The Pangborn shot blast machine, its control panel, and the start of the roller conveyor.
On the first morning two semi trucks and two pickup trucks left our yard. One semi pulled the beavertail trailer with the forklifts. The other pulled the gondola trailer with the skid steer and the two liquid oxygen torches.
The first morning outside our yard, sped up. Two forklifts go up the ramps of the beavertail trailer. Then the two semi trucks and the two pickup trucks leave one by one.
On the first day we brought two forklifts, a small 8,000 lb one and a 12,000 lb one, and two liquid oxygen torches.
The forklift is off the beavertail trailer.
The forklift takes the skid steer off the back of the gondola trailer and sets it on the ground.
Unloading the two liquid oxygen torch rigs.
Each forklift carries one torch rig to the plant door.
Our job right now is to cut things up and pile them up for later pickup with the overhead crane. That area is not easily reached with forklifts, so the large pieces will be craned out.
Cutting the roller conveyor beside the machine.
On the first day we had two torch crews cutting. On the second day one crew continued the same work. We were able to cut down most of the conveyors.
Cutting a conveyor frame with the torch.
Conveyor sections lying on the plant floor.
The area around the job site is full of old, rusted-out steel shot that dried into disgusting cakes. That is why I brought a skid steer with a scrap grapple attachment, to clean this place up somewhat so we can work.
The skid steer inside the plant.
Cleaning up is not my job. I am not required to leave the place broom clean. But we cannot work among piles of shot, so we move it with the skid steer.
The skid steer with the scrap grapple, working along the roller conveyor on the first day.
On the second day I was not there, but my foreman was. This is what he did during that day.
First of all, he removed the remaining equipment on the side of the shot blaster that we started on the first day. He finished by removing the table and the remaining conveyor pieces.
The forklift carries the table away from the machine.
Then he took down a dust collector and another tall structure, which I frankly don't know what it is. He did it by carefully lowering the larger one and dropping down the dust collector, which is very light.
A lot of torching was done with our liquid oxygen torch.
Cutting at the larger structure, a steel box with PANGBORN painted on it.
The box lowered onto the forks of the forklift.
Cutting the duct at the top of the dust collector.
Cutting at the foot of the dust collector's stand.
The dust collector is dropped together with its stand.
The cabinet of the machine on the afternoon of the second day.
On this day, we took down a couple of tall items (a cabinet and a dust collector) and cleaned up one side of the rotoblaster.
Additionally, my foreman loaded the gondola with some of the scrap from that side, although not even close to the entire amount. A lot of metal is laying there waiting to be loaded out, so it is not even close to everything we took down so far.
The gondola trailer comes back to our yard on the evening of the second day.